RFP FY26-06 Engineering for Sawyer Hill Road Culvert
|
Request Date: 11/10/2026 2:17:13 PM
Open Date:
Closing Date: 11/24/2026 3:30 PM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number: FY26-06
|
 |
Town of Mount Holly
PO Box 248
Mount Holly,
VT
05758
|
Locations:
Rutland
Keywords: Consultant Services
Bid Description:
The Town of Mount Holly is seeking proposals from qualified engineering firms to
prepare bidding and construction documents (overall plan and stream profile and cross
section, and project specifications) and permits (ANR Rivers and Streams and Army
Corp of Engineers and ANR Wetlands) for a new precast concrete box culvert to replace
the existing culvert on TH-45 Sawyer Hill Road over an unnamed tributary to Branch
Brook in Mount Holly, VT (approximately 0.15 miles north of VT-103). The existing
structure is a deteriorated squashed corrugated metal pipe (4.5 ft clear span x 3.6 ft clear
height, approximately 13 square feet of waterway opening) with a rotted bottom. It is
listed in urgent condition on VTCulverts.org and overtops the roadway at the 10% AEP
storm. Sawyer Hill Road is a Class 3 gravel road and is the access for approximately 33
homes. The town has a VTrans Structures Grant for the replacement. The town will
prepare one RFP for purchase of replacement culvert material (town preference is Plate
Arch) and one for construction.
|