|
|
Wilmington Town Beach (Lake Raponda) Erosion Mitigation Project
|
Request Date: 9/16/2026 2:00:50 PM
Open Date:
Closing Date: 10/2/2026 5:00 PM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:
|
 |
Windham County Natural Resources Conservation District
28 Vernon Street
Suite 332
Brattleboro,
VT
05301
|
Locations:
Windham
Keywords: Construction (Non Building), Environmental Conservation
Bid Description:
Windham County Natural Resources Conservation District (WCNRCD), with financial assistance provided by the Mount Ascutney Regional Commission Enhancement Design and Implementation Block Grant, requests bids from qualified contractors to implement water quality improvements at the Green Mountain Beach in Wilmington, VT.. Details of the project are provided on the following pages and in the attached construction drawings prepared by DuBois&King, Inc.. A project timeline is provided below. Instructions for submission of the bid sheet are provided below.
This project consists of a variety of practices at the Green Mountain Beach on Lake Raponda to reduce erosion and protect water quality. Practices include grass pavers, infiltration steps, a bioswale, a dry-stacked stone walk, stone bridge, plunge pool, dry swale, check dam, benches and plantings. Please review the attached bid set designs and full specs for project details.
Special Instructions: Please review full RFB with attachments on website. Site walkthrough on September 24 is mandatory for all bidders. Please RSVP to Andrea Haynes at ahaynes@dubois-king.com
|
| Site Visit: |
Date: 9/24/2026 10:00:00 AM |
Mandatory Site Visit |
Please RSVP to Andrea Haynes for the mandatory site visit. |
 |
 |
 |
|