FY26-04 Hortonville Rd Paving
|
Request Date: 6/9/2026 4:20:58 PM
Open Date: 6/9/2026
Closing Date: 6/30/2026 3:30 PM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number: FY26-04
|
 |
Town of Mount Holly
PO Box 248
Mount Holly,
VT
05758
|
Locations:
Rutland
Keywords: Construction (Non Building)
Bid Description:
Base Bid – Section 01 – Hortonville and Shunpike Rd Intersection – 11,000 sf – Shim and
Overlay Paving
At the intersection of Hortonville Road and Shunpike Road to the limits shown on the attached
map (page 4 & 6)
Base Bid – Section 2 - Portion of Hortonville Rd - 3,700lf – Asphalt Paving
From Route 103(start at edge of Route 103) to a point 3,700lf from start point, approximately
275lf beyond the Stop Sign at Old Turnpike Road Intersection (northside stop sign). Also pave
roads – Widening (match existing) for Little Rd and Cole Rd; and Old Turnpike Road ~70 feet
back from west side of intersection with Hortonville Rd (match existing end) and ~40 feet back
from east side of intersection with Hortonville Rd (match existing end). See attached maps (page
3 & 4 & 5) for limits.
|