Business to Business - Vermont Department of Economic Development_ThinkVermont.com_
_ Home _
To print, go to File on the menu bar and select Print.

FY26-04 Hortonville Rd Paving Request Date: 6/9/2026 4:20:58 PM
Open Date: 6/9/2026
Closing Date: 6/30/2026 3:30 PM
Intent To Bid Deadline: 
Est. Dollar Value: $0.00
RFQ Number: FY26-04
Close Window

Town of Mount Holly

PO Box 248
Mount HollyVT 05758

Bid Type:
Job Contract

Locations:
Rutland
Keywords:
Construction (Non Building)

Bid Description:
Base Bid – Section 01 – Hortonville and Shunpike Rd Intersection – 11,000 sf – Shim and Overlay Paving At the intersection of Hortonville Road and Shunpike Road to the limits shown on the attached map (page 4 & 6) Base Bid – Section 2 - Portion of Hortonville Rd - 3,700lf – Asphalt Paving From Route 103(start at edge of Route 103) to a point 3,700lf from start point, approximately 275lf beyond the Stop Sign at Old Turnpike Road Intersection (northside stop sign). Also pave roads – Widening (match existing) for Little Rd and Cole Rd; and Old Turnpike Road ~70 feet back from west side of intersection with Hortonville Rd (match existing end) and ~40 feet back from east side of intersection with Hortonville Rd (match existing end). See attached maps (page 3 & 4 & 5) for limits.

Special Instructions:

Contact Information:
     Clinton Woolley
Phone: (802) 2593179
Fax: 
Email: mthollyroads@vermontel.net
For additional information: https://www.mounthollyvt.org/announcements/

Bid Attachments:
Locus Map Hortonville Rd Paving.pdf  
BID SPECIFICATION - FY2026 Hortonville Rd Paving Reduced.pdf  

Site Visit: Date: