Baptist Street Culvert Replacement, Williamstown
|
Request Date: 5/15/2026 5:06:58 PM
Open Date:
Closing Date: 6/10/2026 10:00 AM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:
|
 |
Friends of the Winooski River
P.O. Box 777
Montpelier,
VT
05601
|
Locations:
Washington
Keywords: Construction (Non Building), Concrete, Culvert Replacement, Stream Restoration
Bid Description:
An existing undersized culvert under Baptist Street will be replaced with a new concrete structure. The work will require an open cut of the roadway and the road will be closed with a detour in place. The existing pipe culvert and failing headwalls will be removed. A 3-sided precast culvert on cast-in-place footings will be installed. Headwalls, wingwalls and guardrail will be constructed. The project also includes channel work to establish a stable, natural stream channel through the crossing.
Special Instructions: The plans are too large to upload. Email Jessica for attachments.
Awardees
|
LAJEUNESSE CONSTRUCTION, INC.
|
6/18/2026 |
|
930 EAST BARRE ROAD EAST BARRE, VT
|
|
|
|
 |
 |
 |
|