High Pressure Line Cap - Cross Street
|
Request Date: 4/22/2026 3:16:21 PM
Open Date:
Closing Date: 5/13/2026 4:30 PM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:
|
 |
Town of Brighton
PO Box 377
49 Mill Street Extension
Island Pond,
VT
05846
|
Bid Type: Request for Proposal
Locations:
Essex
Keywords: Plumbing and Heating, Construction (Non Building), Water Treatment, General Contractor
Bid Description:
The Town of Brighton is soliciting bids from qualified contractors with high pressure lines.
The purpose of this project is to ensure the safe closure of a line to prevent future flooding.
Project Background
There is an abandoned lead service line connected with a gooseneck to the watermain. This froze and ruptured in January of 2025, resulting in flooding of the immediate vicinity on Cross Street. The line has a temporary cap which was placed in the spring of 2025. The line requires removal from the main line. Possible challenges of project to include: Identifying if goose neck is lead soldered or threaded; possibility of gate valve closure failure and expanded contamination of main line.
Scope of Work
• Coordination with Digsafe
• Location and mapping of existing utilities in the project area
• Contractor must be familiar with high risk, tight digs, and preferably have experience with jetting capabilities.
• Must use certified flagging company during any work within the roadway
• Coordination with Vermont Electric Coop to stabilize a utility pole adjacent to project area
• Coordination with H2O innovation for water shut off and relieve pressure from system
• Removal of abandoned pipe off mainline
• Perform all pressure testing and backfill of area to ensure stabilization and future integrity of line
• Coordinate line flushing and boil water notice with businesses, operators, and board.
• Complete cleanup and site preparation for concrete, topsoil, seed and hay.
• Be sure to advise H2O Innovation when water quality testing is needed
• Use of Trench Box is required at the dig site
Cleanup and Final Inspection
• Remove all equipment, debris, and materials from the site.
• Prepare area for reseeding of grass or cement work as needed
• Conduct a final inspection with the Town of Brighton representative and H2O Innovation
Special Considerations
Project must be completed by July 1 or started after July 6 due to July 4th celebration planned in the park
|
| Site Visit: |
Date: |
|