Mountain School Dam Removal and Culvert Replacement
|
Request Date: 3/3/2026 6:00:08 PM
Open Date:
Closing Date: 4/30/2026 5:00 PM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:
|
 |
Stone Environmental Inc.
535 Stone Cutters Way
Third Floor
Montpelier,
VT
05602
|
Locations:
Rutland
Keywords: Construction (Non Building), Culvert Replacement, Stream Restoration
Bid Description:
The project includes removal of the existing 45' long, 7.5’ corrugated metal pipe arch, 50' concrete headwall, 17' concrete spillway and stop log structure along Mountain School Road, stream realignment, construction of a 20' span, 10' tall, and 45' long aluminum multi-plate pipe arch, headwalls, and wingwalls, installation of channel bed material, bank rock, log vanes and sills, and buried grade controls, and restoration of natural flow regime to the Cold River.
|