Business to Business - Vermont Department of Economic Development_ThinkVermont.com_
_ Home _
To print, go to File on the menu bar and select Print.

Culvert Replacement - Valley Road - Holland, VT Request Date: 3/2/2026 3:26:39 PM
Open Date: 
Closing Date: 4/3/2026 5:00 PM
Intent To Bid Deadline: 
Est. Dollar Value: $0.00
RFQ Number: 
Close Window

Stone Environmental Inc.

535 Stone Cutters Way
Third Floor
MontpelierVT 05602

Bid Type:
Job Contract

Locations:
Orleans
Keywords:
Construction (Non Building), Bridge Repair and Construction, Culvert Replacement, Stream Restoration

Bid Description:
This project entails replacing a 60” CMP on a Town Highway with an 18’-0” x 5’-9” single radius aluminum arch, wingwalls, and headwalls on steel express foundations with lean concrete poured-in-place as a leveling pad on bedrock, restoring the historic stream channel, and disconnecting the currently occupied channel. Associated work includes erosion & sediment control, temporary stream diversion, channel/floodplain grading, culvert removal, subsurface preparation, pouring lean concrete, placing steel express foundations, pouring foundations in place, placing single radius aluminum multi-plate pipe arch, riprap protection, backfilling and repaving.

Special Instructions:
The pre-bid meeting is mandatory and will be virtual. Only those expressing interest in bidding project will receive an invite to the meeting. Only those interested in preparing a bid should attend the meeting.
Awardees