MILTON STP 5800 (3)
|
Request Date: 12/1/2025 8:49:42 AM
Open Date:
Closing Date: 1/9/2026 11:00 AM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:
|
 |
Agency of Transportation - Contract Administration
219 North Main Street
Barre,
VT
05641
|
Locations:
Chittenden
Keywords: Construction (Non Building), Paving Contractor, Road Construction
Bid Description:
BEGINNING AT A POINT ON US ROUTE 7 IN THE TOWN OF MILTON AT THE US ROUTE 7 AND CENTRE DRIVE INTERSECTION (MM 3.655) AND EXTENDING APPROXIMATELY 2056.67 FEET IN A NORTHERLY DIRECTION ALONG US ROUTE 7 ENDING AT MM 4.044.
WORK TO BE PERFORMED UNDER THIS PROJECT INCLUDES RECONFIGURATION OF AN EXISTING INTERSECTION, REMOVAL OF THE CONCRETE BASE UNDER US ROUTE 7, THE CONSTRUCTION OF TWO NEW ROADWAYS, FULL DEPTH RECONSTRUCTION, TRAFFIC SIGNALS, LIGHTING, LANDSCAPING, AND OTHER HIGHWAY RELATED WORK. ENGINEERS CATEGORY F
Special Instructions: 12/17/25 - See Addendum #1 at link below.
12/24/25 - See Addendum #2 at link below.
1/8/26 - See Addendum #3 at link below.
Awardees
|
ENGINEERS CONSTRUCTION INC
|
2/12/2026 |
|
98 Engineers Drive South Burlington, VT
|
$6,997,605.75 |
|
|
 |
 |
 |
|