|
|
Black Falls Brook Floodplain Restoration Final Design
|
Request Date: 11/18/2025 1:27:36 PM
Open Date:
Closing Date: 12/19/2025 5:00 PM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:
|
 |
Franklin County Natural Resources Conservation District
50 South Main Street, Suite B-20
St. Albans,
VT
05478
|
Locations:
Franklin
Keywords: Engineering , Environmental Conservation
Bid Description:
This project proposes to improve water quality and increase flood resilience in Montgomery, VT, via floodplain lowering and buffer plantings along the confluence of Black Falls Brook and the Trout River. This project’s design includes excavation of approximately 4.5 acres, with an estimated total sediment removal of 29,000 cubic yards. Due to the project site’s proximity to Route 118 and a nearby bridge, project implementation will include road embankment stabilization, bridge scour protection, and coordination with the Vermont Agency of Transportation (VTrans). Final design will include VTrans Scour Analysis.
Special Instructions: Please contact info@franklincountynrcd.org for the bid documents, which include a detailed RFP, project and site descriptions, and preliminary design.
|