FY26-01 - Paving - Hortonville
|
Request Date: 6/18/2025 7:29:51 AM
Open Date: 6/18/2025
Closing Date: 7/8/2025 3:30 PM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number: FY26-01
|
 |
Town of Mount Holly
PO Box 248
Mount Holly,
VT
05758
|
Locations:
Keywords: Construction (Non Building)
Bid Description:
Base Bid - Portion of Hortonville Rd -5,420 lf – Asphalt Paving
From Shrewsbury Town line (at end of existing asphalt) to a point at the VELCO ROW(at end of existing asphalt). This section of roadway was previously reclaimed in 2021 and is gravel surface. See attached maps (page 4 & 5) for limits.
Alternate 1 – Hortonville and Shunpike Rd Intersection – 10,800 sf – Shim and Overlay Paving
At the intersection of Hortonville Road and Shunpike Road to the limits shown on the attached map (page 4 & 6)
|