Trout Brook Dam Removal Construction Bid
|
Request Date: 4/11/2025 7:13:16 PM
Open Date:
Closing Date: 5/13/2025 4:00 PM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:
|
 |
Franklin County Natural Resources Conservation District
50 South Main Street, Suite B-20
St. Albans,
VT
05478
|
Locations:
Franklin
Keywords: Construction (Non Building), Landscaping, General Contractor, Stream Restoration
Bid Description:
Seeking competitive bids to remove the dam and restore the Trout Brook by an excavation contractor with experience in dam removal or in-river work or work of a similar nature. Work tasks will generally involve removal and disposal of concrete dam, upstream dam rock face, dam outlet works, and all dam appurtenances; removal of trees; removal of impounded sediment (~15,700 CY), haul and placement of fill, grading in restoration area and fill site, invasive species handling, river channel formation; stream channel restoration using onsite bed materials and logs (imported if necessary); floodplain restoration with wood; and site restoration.
The goal of the project is to remove a failing dam and accumulated sediment to protect water quality, restore the stream channel, protect water utility infrastructure, and improve aquatic organism passage and habitat. The Trout Brook Reservoir Dam will be removed. The dam is owned by the Village of Enosburg Falls and the project is being managed by the Franklin County Natural Resources Conservation District (FCNRCD). Project construction is anticipated between July 1, 2025 and October 1, 2025. Instream work periods will limit timing of portions of the work.
Special Instructions:
email jlouisos@slrconsulting.com for design plans
|
Site Visit: |
Date: 4/23/2025 10:00:00 AM |
Mandatory Site Visit |
Meet at the project site near well #2.
44.93777, -72.78219
From the corner of Route 108 and 105 in Enosburg travel northwest on Route 105, turn left on Water Tower Road after 1.4 miles turn right onto Reservoir Road, after 0.6 miles turn left into the private drive to the site. We are meeting on the northwest side of the project site, not at storage tank, which is located at the second entrance to the property.
|
 |
 |
 |
|