Pinello Road Bridge Replacement Project Request Date: 11/22/2024 1:08:58 PM
Open Date: 11/22/2024
Closing Date: 12/20/2024 11:00 AM
Intent To Bid Deadline: 12/20/2024
Est. Dollar Value: $0.00
RFQ Number: 
Close Window

Town of Bethel

134 South Main Street
BethelVT 05032

Bid Type:
Job Contract

Locations:
Windsor
Keywords:
Construction (Non Building), Bridge Repair and Construction

Bid Description:
Bridge 52 is located on Pinello Road (TH 93) approximately 72 feet from the intersection of Pinello Road and Gilead Brook Road and services a single residence. A temporary bridge was installed in 2019 as an emergency response to the failure of the north abutment and subsequently the superstructure due to significant scour during a flood event. The temporary bridge was installed downstream of the existing structure on concrete waste blocks to maintain access to the single residence. This project proposes to construct a new 68-ft span integral abutment bridge on the original alignment, remove the temporary bridge and east abutment of the original structure, and includes associated channel and roadway work.

Special Instructions:
All bidders shall be on the current VTRANS Contract Administration pre-qualified list “Contractors List of Bridge Construction Category”.