|
Terminal Fluorescent Lighting and Controls Replacement
|
Request Date: 2/16/2024 10:58:33 AM
Open Date:
Closing Date: 3/22/2024 10:30 AM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:
|
|
PATRICK LEAHY BURLINGTON INTERNATIONAL AIRPORT
1200 Airport Drive
Box #1
South Burlington,
VT
05403
|
Locations:
Keywords: Lighting and Lighting Fixtures
Bid Description:
*Please see Addendum #1 posted 3/4/24 and Addendum #2 posted 3/12/24.
Due Date: March 22, 2024 at 10:30am
Patrick Leahy Burlington International Airport (BTV) is seeking proposals from contractors to replace the lighting and lighting controls within selected areas of the Terminal Building. The existing terminal lighting and controls are generally original to its 1997 construction and 2004 addition and renovation. The Owner would like to replace luminaires with those with LED light source, along with adding automatic lighting controls to reduce light levels when there is no occupancy or there is adequate daylight. The project will include replacement of all lighting in selected areas as identified in the drawing package, and the replacement of controls in those spaces with automatic controls. The lighting and controls in these spaces, including exit signage, will be replaced in its entirety.
Please visit https://www.btv.aero/about-btv/jobs to view RFP document attachment.
For questions, please contact Kirk Patch at kpatch@btv.aero.
|