|
Ninja Path-Phase 2-Bennington STP BP15(2) & Bennington TAP TA22(9)
|
Request Date: 2/2/2024 12:48:45 PM
Open Date: 3/8/2024
Closing Date: 3/8/2024 2:00 PM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:
|
|
MSK Engineers
P.O. Box 139
150 Depot Street
Bennington,
VT
05201
|
Locations:
Bennington
Keywords: Construction (Non Building), Pedestrian Walkways
Bid Description:
CONSTRUCTION OF APPROXIMATELY 550 LINEAR FEET OF SHARED-USE PATHWAYS, TIMBER BOARDWALKS, AND PREFABRICATED PEDESTRIAN BRIDGE FROM THE MORSE ROAD ACCESS POINT CONTINUING NORTHWEST TO THE END OF NINJA PATH PHASE I AT THE VT 279 OVERPASS. BID ALTERNATE 1 INCLUDES THE CONSTRUCTION OF APPROXIMATELY 600 LINEARFEET OF SHARED USE PATHWAY AND BID ALTERNATE 2 INCLUDES THE CONSTRUCTION OF APPROXIMATELY 600 LINEAR FEET OF SHARED USE PATHWAY.ACCESS POINT AT MORSE ROAD.
Special Instructions: Contact Engineer for access to Bid Documents link.
|