Business to Business - Vermont Department of Economic Development_ThinkVermont.com_
_ Home _
To print, go to File on the menu bar and select Print.

Town of Manchester Development of Green Mountain Estates Pump Station Upgrade Request Date: 11/15/2023 1:02:38 PM
Open Date: 
Closing Date: 12/15/2023 4:00 PM
Intent To Bid Deadline: 
Est. Dollar Value: $0.00
RFQ Number: 
Close Window

DUFRESNE GROUP

56 Main Street
Suite 200
SpringfieldVT 05156

Bid Type:
Job Contract

Locations:
Bennington
Keywords:
Construction (Non Building)

Bid Description:
1. The design, supply, and installation of a replacement duplex grinder pump and control system in the existing 5745 gallon wet well with 4"PVC x approximately 1700' force main, with approximately 5' of vertical elevation difference. 2. Calculate design flows for gravity system connected to pump station, for (40) 3-4 bedroom homes, (1) 165,000 sf industrial building, (l) chiropractic office, (1) 3000 sf school building, and (1) 8200 sf conference center. Design flows shall be calculated in accordance with the Vermont Wastewater Disposal and Potable Water Supply Rule. 3. Identify and recommend any existing structural or design flaws in the current system that would not be corrected with the above referenced installation. 4. The bidder shall include evidence of Liability

Special Instructions:

Awardees