Town of Chelsea Brook Rd/Hook Rd/Pent Rd Flood Damage Repairs Request Date: 8/22/2023 1:55:47 PM
Open Date: 
Closing Date: 8/29/2023 12:00 PM
Intent To Bid Deadline: 
Est. Dollar Value: $0.00
RFQ Number: 
Close Window

TWO RIVERS-OTTAUQUECHEE REGIONAL COMMISSION

128 King Farm Road

WoodstockVT 05091

Bid Type:
Job Contract

Locations:
Orange
Keywords:
Construction (Non Building), Traffic Control, Culvert Replacement, General Contractor, Road Construction

Bid Description:
Project Scope: The contractor will be responsible for eight sites which includes the removal and diposal of debris, and the purchasing and hauling of materials unless other wise indicated. Brook Road Site 1 - 43-58-32 lat 72-28-49 long – West Side of Road North of Allen Farm. Repair slope/replace culvert 75 ft x 20 ft. Excavate 222 Cy yards and replace with similar amount of Stone Fill Type IV. Culvert provided by Town. Site 2 - 43-58-45 lat 72-28-53 long – Near Joe Compos. Replace culvert, fix outlet.25ft x 10ft. Excavate 37 CY and replace with similar amount of Stone Fill Type IV. Culvert provided by Town. Site 3 - 43-59-44 lat 72-29-20 long – Near Button Farm. Repair/Reestablish ditch 150 ft x 6 ft Excavate 33 CY replace with similar amount of Stone fill IV and 1 -1/2” crushed stone. Material provided and hauled by town. Site 4 – 43-59-52 lat 72-29-20 – East side of Road, south of Pent Road – Repair uphill slide area and reestablish ditch 75ft x 20 feet excavate 17 CY and replace with similar amount of Stone Fill Type I and 8 CY 1 – 1/2 “ crushed Stone Site 5 – North of Pent Road. Repair/reestablish ditch. 300ft x 6ft. Excavate 66 CY material, replace with similar amount of Stone Fill Type 1and 33 CY 1 -1/2” Crushed Stone. Material provided and hauled by town. Hook Road Site 1 - 43-58-51 lat 72-30-10 long by Rick Allen’s. Fix shoulder of road and ditch. 200ft x 8ft Excavate 59 CY of material, replace with similar amount of Stone Fill Type I and 29 CY 1 – ½” crushed stone. Material provided and hauled by town. Site 2 - 43-58-51 lat 72-30-10 long – By cemetery. Fix shoulder of road and ditch. Replace Culvert. 1320 Ft x 8. Excavate 391 CY material, replace with similar amount of Stone Fill Type 1 and 195 CY 1 -1/2” Crushed Stone. Materials and culvert provided and hauled by Town. Pent Road - 44-00-32 lat 72-29-24 long – by Coburn’s Replace undersized culvert and stone line ditch. 550 ft x 8ft Excavate 163 CY material, replace with similar amount of Stone Fill Type 1 and 81 CY 1 -1/2” Crushed Stone. Materials and culvert provided and hauled by Town. Town will resurface road.

Special Instructions:
Bidders should note that a preconstruction meeting with the Stream Alterations Engineer may be required prior to the start of work. The Stream Alterations Engineer for this project is Jaron Borg. Jaron may be reached at (802) 371-8342, or Jaron.Borg@vermont.gov.