|
Dam Removal Feasibility Study at Trout Brook Reservoir Dam, Missisquoi River Watershed
|
Request Date: 12/20/2022 12:39:39 PM
Open Date:
Closing Date: 1/23/2023 12:00 PM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:
|
|
Franklin County Natural Resources Conservation District
50 South Main Street, Suite B-20
St. Albans,
VT
05478
|
Bid Type: Request for Proposal
Locations:
Franklin
Keywords: Stream Restoration, Environmental Conservation, Environmental Consultant Services
Bid Description:
FCNRCD seeks the services of a qualified engineering firm to prepare a dam removal feasibility report detailing options and preliminary cost estimates to improve fish passage at the Trout Brook Reservoir Dam Site in the middle reaches of the Missisquoi River. This report package should be completed by June 1st, 2023.
Special Instructions: Please mail written proposals to:
Franklin County Natural Resources Conservation District attn: Lauren Weston
50 South Main St., Suite B-20
St. Albans, VT 05478
Electronic proposals in Adobe Acrobat (PDF) format should be mailed on a disc to the same address, or e-mailed to (e-mail is preferred):
info@FranklinCountyNRCD.org
Questions may be directed to Lauren Weston at 802-528-4176 or info@FranklinCountyNRCD.org
|