Burlington Greenway Phase 3B South Construction Request Date: 7/17/2020 4:47:26 PM
Open Date: 
Closing Date: 5/18/2021 1:00 PM
Intent To Bid Deadline: 
Est. Dollar Value: $0.00
RFQ Number: 
Close Window

BURLINGTON PARKS AND RECREATION DEPT

645 Pine Street, Suite B
BurlingtonVT 05401

Bid Type:
Job Contract

Locations:

Keywords:
Consultant Services, Water Craft Equipment and Supplies

Bid Description:
The City of Burlington Department of Parks, Recreation and Waterfront is seeking bids for the Burlington Greenway Phase 3B South as part of the Burlington Greenway Rehabilitation. LOCATION: The Project is located on the existing Burlington Greenway within Oakledge Park, between Flynn Avenue and Austin Drive in the City of Burlington, Vermont. TYPE OF CONSTRUCTION: This project involves reconstruction and widening of the Burlington Bike Path, including removal of the existing pavement, excavation and replacement of the subbase, repaving the surface, construction of plazas, construction of stone retaining walls, and incidental construction items.

Special Instructions:
Bids Requested: April 23rd, 2021 Mandatory Pre-Bid Virtual Meeting: April 30th, 2021 @1pm - see bid docs for zoom link and registration Questions due: on or before May 5th, 2021. Bid deadline changed to May 18th, 2021 @1pm - due electronically only. Visit City of Burlington Proposal, Bids and Quotes page for updated information: https://www.burlingtonvt.gov/RFP
Awardees
Engineers Construction Inc.
8/24/2020  
98 Engineers Drive
South Burlington, VT