Terminal Integration Project Request Date: 6/9/2020 9:30:59 AM
Open Date: 
Closing Date: 7/22/2020 2:00 PM
Intent To Bid Deadline: 
Est. Dollar Value: $0.00
RFQ Number: 
Close Window

PATRICK LEAHY BURLINGTON INTERNATIONAL AIRPORT

1200 Airport Drive
Box #1
South BurlingtonVT 05403

Bid Type:
Job Contract

Locations:

Keywords:
Construction (Building)

Bid Description:
The project is being bid as a Design-Build contract.The work generally consists of the final design and construction for the expansion of the existing terminal building. The project will serve to improve connectivity between the North and South Concourses, expand passenger queueing space, and provide a larger TSA screening area. The total estimated floor area of the expansion is 35,000 square feet. A preliminary design and summary report has been completed and is presented in the Bid Documents. For questions about this project, please contact Larry Lackey at llackey@btv.aero.

Special Instructions:
*Please note the addition of addenda #1-#8. Addendum #8 added 9/30. Please visit https://www.btv.aero/about-btv/jobs/btv-terminal-integration-project for bid documents.