BGS-Statehouse South Elevation East Side-Masonry Restoration Request Date: 7/31/2019 4:32:22 PM
Open Date: 
Closing Date: 8/21/2019 1:00 PM
Intent To Bid Deadline: 
Est. Dollar Value: $100,000.00
RFQ Number: 
Close Window

Buildings & General Svs, Office of Purchasing & Contracting

133 State Street, 5th Floor
MontpelierVT 05633-8000

Bid Type:
Request for Proposal

Locations:
Washington
Keywords:
Masonry

Bid Description:
INVITATION TO BID DEPARTMENT OF BUILDINGS AND GENERAL SERVICES STATE OF VERMONT Contractors are invited to bid on the State House South Elevation – East Side Masonry Restoration Project for the Department of Buildings & General Services located at 115 State Street in Montpelier, Vermont. This project consists of, but is not limited to: A. Perform all work as shown on the Drawings or as specified herein. All work shall be completely coordinated with the work of all trades and shall provide for a complete and fully functional installation in all respects. B. Drawings and Specifications shall be taken together; provide as though mentioned in both, work specified and not shown, or work shown and not specified. Although such work is not specifically shown or specified, provide as part of this work, all supplementary or miscellaneous items, appurtenances, devices or materials incidental to or necessary for a sound, secure and complete installation. C. Contractor shall provide all labor, materials and equipment for the necessary to satisfactorily complete the Vermont State House Masonry Restoration of the South Elevation – East Side. The work consists of, but not limited to, the following major components: 1. The contractor shall be responsible for masonry repointing of approximately 2,000 SF of granite masonry. 2. The contractor shall protect the existing finishes from damage. The contractor shall be responsible for taking care, not to destroy the historic integrity of this historic structure and its exterior finishes. Careless damage to these finishes shall not be tolerated. 3. Repointing shall include from the roof edge to 4” below ground level as shown in the construction document, adjacent windows, granite windowsill, jambs, pediment/ headers and all eave detailing on the South Facade- East End shall be included in this scope of work. 4. Preserve and protect the existing walls finishes during work. The contractor shall conserve all intact finishes and protect these surfaces from damage through the work process. 5. The contractor shall verify that all existing exterior masonry is stable prior to repointing. 6. The contractor shall carry an allowance of $5,000 for repairing masonry as required. Contractor shall repair masonry as required and approved by Owner. 7. Repointing and clean washing of all masonry restoration work is required on all work surfaces. 8. Contractor shall restorative mortar to match existing mortar color and joint detailing on the North Center Elevation at the back of the 1858 State House. 9. Contractor shall protect all existing windows from damage. 10. Contractor shall keep emergency egress access available during the project. 11. The contractor shall provide temporary power to the job site from 10/28 to 11/15 (the anticipated three weeks that the State House power will be shut down), if required for work. 12. Contractor shall be required to clean-up daily before leaving site. 13. The building work hours are 7am-4pm M-F, except weekends and state holidays, and unless otherwise requested and allowed by the Capital Police and. During the work, the contractor shall coordinate their schedule and area of work, as required by owner. 14. The contractor shall coordinate work schedule with the owner and the Sergeant at Arms office, so that it does not conflict with other building actives. Sealed Bids accompanied by proper Bid Security will be received by the Department of Buildings and General Services, at 109 State Street, Montpelier, Vermont 05609-3001, until 1:00PM on August 21, 2019, at which time they will be opened and publicly read aloud in the department conference room. Documents may be obtained from Blueprints, Etc., 20 Farrell Street, South Burlington, VT 05403, by phone at 802.865.4503, by fax at 802.865.0027 or email to: orders@blueprintsetc.com. Project Manuals and Plans are available for preview at: http://www.blueprintsetc.com in the Public Plan Room. Any and all notifications, releases and addendums associated with this project will be posted at http://www.blueprintsetc.com. There is a non-refundable fee for each set of documents purchased. Fee to Include one (1) Hard Copy & one (1) Digital CD-ROM Copy: $60.00 1. Please be advised that all notifications, releases, and addendums associated with this RFP will be posted on-line in the plan room where the original solicitation resides unless otherwise determined that a hard copy is necessary. The state will make no attempt to contact contractors with updated information. It is the responsibility of each contractor to periodically check the posting site for any and all notifications, releases and addendums associated with the RFP. 2. NOTE: On occasion hard copy addendums may be required due to size or type of media/requirements. If applicable and as determined by the Department of Buildings and General Services, addendums that require hard copy distribution, a copy of such addenda will be mailed or delivered for each set of plans and specifications issued to the bidders, prior to the bid date. However, it is the responsibility of the bidder to be sure they have received all addenda, and must so state the number of addenda they have received on the proposal. 3. If Bidders choose to pull information from other third-party sites, Bidders’ do so at their own risk as there is one official source of information for documents as indicated above. There will be a pre-bid meeting at the site located at 115 State Street in Montpelier, VT on August 6, 2019 at 2:00PM. QUESTION AND ANSWER PERIOD: Any vendor requiring clarification of any section of this RFP or wishing to comment or take exception to any requirements of the RFP must submit specific questions in writing to BGS.OPCVendorDocs@vermont.gov no later than 12:00 PM on August 12, 2019. All questions should include State House South Elevation – East Side Masonry Restoration Project in the subject line. Any comments, questions, or exceptions not raised in writing on or before the last day of the question period are waived. At the close of the question period a copy of all questions or comments and the State's responses will be posted at http://www.blueprintsetc.com. Every effort will be made to post this information as soon as possible after the question period ends, contingent on the number and complexity of the questions. Bidder’s attention is directed to: 1. General Conditions for Construction Contracts. It is the Bidder’s responsibility to thoroughly read and comply with all requirements. Please pay close attention due to changes that have been made. 2. BIDDER QUALIFICATION PROCESS DOCUMENT: The Department of Buildings and General Services is requiring that all contractors meet certain minimum qualifications to be eligible to bid on this project. 3. BID SUBMISSION INSTRUCTIONS: a. CLOSING DATE: Bids must be received by the due date and at the location specified on the front page of this RFP. b. The bid opening will be held at 109 State Street, Third Floor, Montpelier, VT and is open to the public. c. SECURITY PROCEDURES: Please be advised extra time will be needed when visiting and/or delivering information to 109 State Street. All individuals visiting 109 State Street must present a valid government issued photo ID when entering the facility. d. SEALED BID INSTRUCTIONS: All bids must be sealed and must be addressed to the State of Vermont, Office of Purchasing & Contracting, 109 State Street – Third Floor, Montpelier, VT 05609-3001. BID ENVELOPES MUST BE CLEARLY MARKED ‘SEALED BID’ AND SHOW THE PROPOSAL TITLE, OPENING DATE AND NAME OF BIDDER. e. All bidders are hereby notified that sealed bids must be received and time stamped by the Office of Purchasing & Contracting located at 109 State Street – Third Floor, Montpelier, VT 05609-3001 - by the time of the bid opening. Bids not in possession of the Office of Purchasing & Contracting at the time of the bid opening will be returned to the vendor, and will not be considered. Any delay deemed caused by Security Procedures or courier/mail delivery service will be at the bidder’s own risk. f. Office of Purchasing & Contracting may, for cause, change the date and/or time of bid openings or issue an addendum. If a change is made, the State will make a reasonable effort to inform all bidders by posting at: http://www.blueprintsetc.com . g. All bids will be publicly opened. Typically, the Office of Purchasing & Contracting will open the bid, read the name and address of the bidder, and read the bid amount. However, the Office of Purchasing & Contracting reserves the right to limit the information disclosed at the bid opening to the name and address of the bidder when, in its sole discretion, the Office of Purchasing & Contracting determines that the nature, type, or size of the bid is such that the Office of Purchasing & Contracting cannot immediately (at the opening) determine that the bids are in compliance with the RFP. As such, there will be cases in which the bid amount will not be read at the bid opening. Bid openings are open to members of the public. Bid results are a public record however, the bid results are exempt from disclosure to the public until the award has been made and the contract is executed. 4. DELIVERY METHODS: a. SECURITY PROCEDURES: Note that security procedures concerning delivery of any mail or parcels to 109 State Street may delay receipt of mail/parcel pieces by one business day. b. U.S. MAIL: Bidders are cautioned that it is their responsibility to originate the mailing of bids in sufficient time to ensure bids are received and time stamped by the Office of Purchasing & Contracting prior to the time of the bid opening. c. EXPRESS DELIVERY: If bids are being sent via an express delivery service, be certain that the RFP designation is clearly shown on the outside of the delivery envelope or box. Express delivery packages will not be considered received by the State until the express delivery package has been received and time stamped by the Office of Purchasing & Contracting. Due to security procedures express deliveries must be received by 10:30 AM in order to be received by the Office of Purchasing & Contracting that same day. d. HAND DELIVERY: Hand carried bids shall be delivered to a representative of the Office of Purchasing & Contracting prior to the bid opening. e. ELECTRONIC: Electronic bids will not be accepted. f. FAX BIDS: Faxed bids will not be accepted. 5. Full Bonding is required for this job. 6. CONSTRUCTION CONTRACTOR EVALUATION FORM: The Department of Buildings and General Services (BGS) may require contractor evaluations on construction projects over $100,000 or at the discretion of the BGS Director. Evaluations will be used to compile contractor’s performance on BGS projects to provide a history and assessment of the contractor’s performance. 7. It is the Bidder’s responsibility to thoroughly read and comply with all instructions and requirements of this bid solicitation.

Special Instructions:
PROJECT DOCUMENTS WILL BE AVAILABLE AT BLUEPRINTS ETC BEFORE NOON (THURSDAY) 08/01/19 MORNING. QUESTIONS DUE: 08/12/19 AT 12:00 PM
Awardees
E F WALL & ASSOCIATES, INC.
9/26/2019  
131 South Main Street
Barre, VT
$58,400.00