|
CHARLOTTE NHG SGNL (49)
|
Request Date: 2/27/2019 2:34:20 PM
Open Date:
Closing Date: 3/22/2019 11:00 AM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:
|
|
Agency of Transportation - Contract Administration
219 North Main Street
Barre,
VT
05641
|
Locations:
Chittenden
Keywords: Construction (Non Building), Paving Contractor, Road Construction
Bid Description:
LOCATED IN THE TOWN OF CHARLOTTE AT THE INTERSECTION OF US ROUTE 7, FERRY RD (TH #3) AND CHURCH HILL ROAD (TH #2) AT MILE MARKER 3.436.
WORK SHALL CONSIST OF THE REMOVAL OF THE EXISTING TRAFFIC SIGNAL SYSTEM AND THE INSTALLATION OF NEW TRAFFIC SIGNAL MAST ARM POLES, SIGNAL CONTROLLER CABINET, CLOSURE OF AN EXISTING GRAVEL DRIVEWAY, AND OTHER HIGHWAY RELATED ITEMS. ENGINEERS CATEGORY B.
Awardees
|
ENGINEERS CONSTRUCTION INC
|
4/15/2019 |
|
98 Engineers Drive South Burlington, VT
|
$356,234.60 |
|
|
|
|
|
|