East Barre Sidewalk - EH06(19) Construction Inspection Services
|
Request Date: 4/19/2018 2:38:35 PM
Open Date: 4/19/2018
Closing Date: 5/10/2018 10:30 AM
Intent To Bid Deadline:
Est. Dollar Value: $0.00
RFQ Number:
|
|
Town of Barre
149 Websterville Road
PO Box 116
Websterville,
VT
05678
|
Bid Type: Request for Proposal
Locations:
Washington
Keywords: Construction Management, Pedestrian Walkways
Bid Description:
The Town of Barre, Vermont, hereinafter referred to as the Municipality, is soliciting Construction
Inspection Services for the above referenced project. Construction includes, but is not limited to,
approximately 550 feet of new sidewalk with 5 in. granite curbing along the southeast side of Mill St
in East Barre Village and along the northeast side of Websterville Rd from Mill St. to the post office,
plus two landings and two access spurs.
Awardees
|
John Turner Consulting
|
5/23/2018 |
|
19 Dover Street Dover, NH
|
|
|
|
|
|
|
|