Business to Business - Vermont Department of Economic Development_ThinkVermont.com_
_ Home _
To print, go to File on the menu bar and select Print.

Ed Weed Fish Culture Station Facility Boiler Replacement Request Date: 2/7/2014 4:04:19 PM
Open Date: 
Closing Date: 3/5/2014 1:00 PM
Intent To Bid Deadline: 
Est. Dollar Value: $185,000.00
RFQ Number: 
Close Window

Buildings & General Svs, Office of Purchasing & Contracting

133 State Street, 5th Floor
MontpelierVT 05633-8000

Bid Type:
Request for Proposal

Locations:

Keywords:
HVAC

Bid Description:
INVITATION TO BID DEPARTMENT OF BUILDINGS AND GENERAL SERVICES STATE OF VERMONT Contractors are invited to bid on the Ed Weed Fish Culture Station Facility Boiler Replacement Project, in Grand Isle, Vermont. This project consists of, but is not limited to, the removal and replacement of two propane fired boilers, along with associated pumps and equipment, and the reworking of an existing heat exchanger for reduced water flows. Sealed Bids accompanied by proper Bid Security will be received by the Department of Buildings and General Services, at 10 Baldwin Street, Montpelier, Vermont, until March 5, 2014 at 1:00PM, at which time they will be opened and publicly read aloud in the department conference room. Documents may be obtained from Blueprints Etc, 20 Farrell Street, South Burlington VT 05403, by phone at 802-865-4503, by fax at 802-865-0027 or email to: orders@blueprintsetc.com. Project Manuals and Plans are available for preview and download at: http://www.blueprintsetc.com in the Public Plan Room. Any and all notifications, releases and amendments associated with this project will be posted at http://www.blueprintsetc.com. There is a non-refundable fee of for each set of documents. Hard Copy Fee: $30.00 Downloadable Fee: $30.00 1. Please be advised that all notifications, releases, and addendums associated with this RFP will be posted on-line in the plan room where the original solicitation resides unless otherwise determined that a hard copy is necessary. The state will make no attempt to contact contractors with updated information. It is the responsibility of each contractor to periodically check the posting site for any and all notifications, releases and addendums associated with the RFP. 2. NOTE: On occasion hard copy addendums may be required due to size or type of media/requirements. If applicable and as determined by the Department of Buildings and General Services, addendums that require hard copy distribution, a copy of such addenda will be mailed or delivered for each set of plans and specifications issued to the bidders, prior to the bid date. However, it is the responsibility of the bidder to be sure they have received all addenda, and must so state the number of addenda they have received on the proposal. There will be a mandatory pre-bid meeting at the site on February 12, 2014 at 10:00AM. The project is located at 14 Bell Hill Road, Grand Isle, Vermont, at the existing Fish and Wildlife Department’s Ed Weed Fish Culture Station, located on the east side of Route 314 across from the Grand Isle ferry crossing. Bidder’s attention is directed to: 1. It is the Bidder’s responsibility to thoroughly read and comply with all instructions and requirements of this bid solicitation. 2. This project is being funded, in whole or in part, through the state’s capital construction act(s) and shall require compliance with the Vermont Prevailing Wage Rate requirements (see Attachment D, paragraph17). A complete list of occupations and associated wage rates are available on the internet at: http://www.vtlmi.info/lmipub.htm#pw. 3. Full Bonding is required for this job. The Project Engineer, Kevin Kelsey, may be contacted for technical questions at 802-372-3171.

Special Instructions:

Awardees
A COOPER MECHANICAL
5/23/2014  
171 Leroy Road
Williston, VT
$170,000.00